Skip to main content

How to schedule feature releases

Availability

Version: 4.16+

There's a whole host of reasons why you may want to schedule the release of a feature, such as:

  • to release a feature at a specific date and time (for a product launch, for instance)
  • to make a feature available only up until a specific moment (for a contest cutoff, for instance)
  • to make a feature available during a limited period (for a 24 hour flash sale, for instance)

In this guide we'll schedule a feature for release at some point in time. The exact same logic applies if you want to make a feature available until some point in the future. Finally, if you want to only make a feature available during a limited time period, you can easily combine the two options.

Prerequisites

This guide assumes that you've got the following:

  • some basic experience with Unleash
  • a running instance of Unleash and connected clients (where applicable)
  • an existing feature flag that you want to schedule the release for

Schedule feature releases with strategy constraints

Strategy constraints are the easiest way to schedule feature releases (as long as your SDKs are up to date). You can use this approach with any strategy you want. The strategies will work just as they normally do, they just won't become active until the specified time. For example: with the standard strategy, the feature would become available to all your users at the specified time; with a gradual rollout, the rollout would start at the specified time.

Step 1: Add an activation strategy with a date-based constraint

Scheduling a release via the UI

To schedule a feature release via the UI:

  1. Add the desired activation strategy to the feature
  2. Open the constraint creator by using the "Add constraint" button
  3. Add a date-based constraint by selecting the currentTime context field (step 1 in the below image), choosing the DATE_AFTER operator (step 2), and setting the point in time where you want the feature to be available from (step 3) A strategy constraint specifying that the activation strategy should be enabled at 12:00 AM, November 25th 2022. There are visual call-outs pointing to the relevant settings mentioned above.

Scheduling a release via the API

To add an activation strategy via the Admin API, use the feature's strategies endpoint to add a new strategy (see the API documentation for adding strategies to feature flags for more details).

The payload's "name" property should contain the name of the strategy to apply (see activation strategies reference documentation for all built-in strategies' modeling names).

The "constraint" object should have the same format as described in the code sample below. The activation date must be in an RFC 3339-compatible format, e.g. "1990-12-31T23:59:60Z".

Add a feature activation strategy with a scheduled activation time.
POST <unleash-url>/api/admin/projects/<project-id>/features/environments/<environment>/strategies
Authorization: <API-token>
content-type: application/json

{
"name": "default",
"constraints": [
{
"value": "<activation-date>",
"operator": "DATE_AFTER",
"contextName": "currentTime"
}
]
}

The "operator" property in the code sample can be replaced with any of the other date and time-based operators according to your needs.